• HM Ensuite

    HM Ensuite

    This ensuite was a complete refurbishment with the old tiles being removed and the old shower and tray removed also. The shower tray wasn’t the full width of the room so a stud wall was built to accomodate pipe work and the new shower tray. We then tiled the walls and floor and fitted the sanitary ware.

    Check out our pictures of the completed job!

    More Info

  • Complete Tiling of a New Build

    Complete Tiling of a New Build

    For this job we completed the tiling of the complete ground floor of a 2 storey new build, which included the conservatory, living room, kitchen, halls, bathroom, right from the front door to the garage. All of the floors had underfloor heating which lent itself very well to a tiled floor. We also tiled the walls and floor of the upstairs main bathroom and the master bedroom ensuite.

    Check out our before and after pictures of the completed job!

    More Info

  • TA Wide Joint Format

    TA Wide Joint Format

    At the customers request we used a wide-joint format on this job. This gives the “old fashioned” appearance to the finished job. The tiling was also completed in a brick pattern in order to give the floor a little character. We finished it off with a skirting tile cut from the same tile with our own water saw to give a clean-cut edge.

    Check out our pictures of the completed job!

    More Info

  • ET Large Format Tiles

    ET Large Format Tiles

    During this project we completed the tiling of the complete ground floor of a new build, which included the living room, kitchen, halls, bathroom and utility room, right from the front door to the back door. The customer wanted to use a large format tile (measuring 600mm x 600mm) with a brick pattern and a small grout joint for a modern look.

    Check out our pictures of the completed job!

    More Info

  • RM Kitchen

    RM Kitchen

    For this customer we removed their old tiles between the kitchen units. We then designed the tiling using the customers colours, to suit the customers requests, including a special section for under the cooker hood. When the customer was happy with the proposed design we proceeded to completely retile.

    Check out our pictures of the completed job!

    More Info

  • TA Kitchen & Hall

    TA Kitchen & Hall

    We tiled the kitchen and back hall of this house at a 45 degree angle with a border tile around the perimeter of the rooms. The entrance hall was then tiled in a different format with a patterned tile set at a 45 degree angle.

    Check out our pictures of the completed job!

    More Info

  • DM Hallway & Doorstep

    DM Hallway & Doorstep

    As each room to be tiled differs in dimensions planning and designing a bepoke design takes time to layout properly, but pays dividends when the compeleted job is seen. This design was set out to include an inner border of triangles surrounding plain, large-format tiles (600mm x 600mm). The doorstep was again a bespoke design incorporating a design in the centre of the top step with the step edges highlighted by a row of black tiles.

    Check out our pictures of the completed job!

    More Info

  • MW Bathroom and Hotpress

    MW Bathroom and Hotpress

    This job was a bathroom refurbishment, we removed all the old tiles, fitted the bathroom with an under tile heating mat and retiled both the shower enclosure walls and the floor which also included a skirting tile fitted around the bathroom. We also made some improvements to the walk in hotpress, we installed a wooden floor and reshelved the area to suit the customers needs.

    Check out our pictures of the completed job!

    More Info

  • AD Bathroom

    AD Bathroom

    For this customer we completed refitted their bathroom, including installing a new shower tray and shower doors including shower proofing the walls before we tiled them. The walls were then completely retiled after which the toilet and sink were refitted.

    Check out our pictures of the completed job!

    More Info

  • BM Garage Conversion

    BM Garage Conversion

    When we started this job, this room was a double garage, both garage doors were removed and built up to sill height and 2 new windows were fitted to the front of the room. On the side of the room, two windows were cut out and a brick fireplace was built between the windows to accomodate a wood burning stove. The back wall of the room was almost completely removed and patio doors with side windows were installed to allow maximum light to enter the room. The floor was raised to the same level as the rest of the house and the floor was then tiled. Only at this point did we break through into the house via a set of wooden double doors, this was left to the end to minimise dust and distruption to the rest of the house.

    Check out our pictures of the completed job!

    More Info

  • RM Bathroom

    RM Bathroom

    We completely refitted this customers bathroom. A new shower was fitted after which an under tile heating mat was placed and both the walls and floor were tiled with a border, following our pre-approved bespoke design. At this point we put a new PVC ceiling in the bathroom with downlighting LED spotlights.

    Check out our pictures of the completed job!

    More Info

  • DM Wooden Floor

    DM Wooden Floor

    This customer wanted a new wooden floor instead of their old carpet, so we lifted the carpet and replaced it with a laminate wooden floor and finished with an oak skirting board around the room with door arcitrives.

    Check out the completed job!

    More Info

  • AR Boiler Enclosures

    AR Boiler Enclosures

    The old boiler enclosure in this house was falling apart, we removed it for the customer and replaced with a purpose built boiler enclosure which incorporated a lean to roof with additional cover for the customer’s gas bottles.

    Check out our pictures of the completed job!

    More Info

  • SM Roofspace Conversion

    SM Roofspace Conversion

    This customer requested a complete roofspace conversion in this house. The roofspace was completely insulated, floored and divided into 2 bedrooms, study, bathroom and a snooker room. We then fitted velux windows into the roof of three of the rooms and a normal window cut into the gabel wall in the snooker room. The divisions were then insulated, plasterboarded and finished to the highest standard.

    Check out our pictures of the completed job!

    More Info